Radiation Safe Decontamination for Nuclear Pools
U-DEC
U-DEC Underwater DeContamination unit.
The U-DEC robot allows safe decontamination of reactor pools in nuclear power plants. Its twin decontaminating rollers, integrated pump, and remote operation minimize radiation exposure while delivering highly effective cleaning.
Starts from €4,080 per month*
*Leased over a 5 year period
*Listed price is exclusive of taxes & duties
Technical Data
- Pump Capacity: 1200 l/min
- Cleaning Speed: 0-0.4 m/s
- Power Supply: 400V 50Hz / 480V 60Hz
- Special materials: Stainless steel, anodized aluminum
- Dual decontamination rollers with Scotch Brite pads
- Nuclear-certified design modifications
Best suited for
- BWR and PWR reactor pools
- Spent fuel basins
- Nuclear decontamination contractors
- Utilities minimizing worker dose exposure
U-DEC In action
Watch this video for more information on how the U-DEC operates
Ready to Add No-Drain Cleaning to Your Services?
Contact us
We have offices in Södertälje and Höganäs and are always close at hand with an email or a phone call.






